How important is the role of workshop assembly line in the production workshop

2022-01-12 11:22:59
times

Workshop assembly line in around the warehouse, production workshop and packaging workshop site, set up by a lot of belt assembly line, roller assembly line and so on one conveyor chain, connected by end to end to form a continuous assembly line. At the entrance of the material and out of the sorting line - line mouth is provided with and path fork device, lift and ground line. The way of sequence change is to put the changed product into the assembly line immediately after the first procedure has been completed without interrupting the production line. The method of simultaneous change is to interrupt the assembly line at the same time and change the whole process simultaneously. This approach is particularly effective in cases where the semi-finished product can be used as a reserve for the various processes so that it can be applied at any time, and in cases where there is a discrepancy between the time of the product and that of the product to be put into production. When the number of processes of the product is small, and the total operation time is relatively short (small pieces), or the change is relatively simple, the time required is relatively short variety change, also use this method. Assembly line is mainly to complete its material conveying task.


流水线设备


So in the warehouse, production workshop and packaging workshop within the scope of the formation of a smooth to each production position at the same time is closed circulation assembly line system. All materials, parts, components and finished products used in the production process must be placed in pallets with bar codes before entering the assembly line system. Under the action of production orders issued by the production management system, pallets containing materials enter the assembly line system from designated inlets. Check the deviation value of the two planes of the head and tail frame mounting bearing seat. If the deviation between the two planes is greater than 1mm, the two planes should be adjusted in the same plane. The adjustment method of the head drum is: if the conveyor belt deviates to the right side of the drum, the bearing seat on the right side of the drum should move forward or the bearing seat on the left side should move backward; If the conveyor belt deviates to the left side of the drum, the bearing seat on the left side of the drum should move forward or the bearing seat on the right side should move backward. The adjustment method of the tail drum is just opposite to the head drum.


1. The production capacity of each process on the workshop assembly line is balanced and proportional, and the existence of bottlenecks is not allowed. The distribution of materials required for production must be timely, accurate and qualified according to the beat.


2. All kinds of auxiliary processes of production and material distribution activities are carried out around the assembly line. Raw materials and parts should be delivered online from various areas according to the requirements of anti-radiation, so that the products on the line are moving, the workers are relatively fixed, and the assembly line is the "served".